The smart Trick of Bunker Prices That No One is Discussing
It have to be taken care of that there is adequate ullage in the last tank loaded for draining pipelines or hose connections. Samples are to generally be sealed and labeled correctly inside the presence of the ship crew.Look for the weight and size on the hose with issue of its coupling for injury. Go over the bunkering system and transfer course o